Hydel Power Projects in Nilgiris Print E-mail

The Kundah hydro-electric project is the one of the biggest schemes executed to generate electricity in the Tamil Nadu state. The group of peaks Devarbatta, Karaikada, Koulingabetta and Porthimund, all over 2400 Metres ASL (above sea level) in Nilgiris drain their water into the two streams, the Avalanche and the Emerald. These two dams along with Upper Bhavani form the major source of water for Kundah hydro-electric project. Kundah hydro-electric project is a symbol of India-Canada friendship and co-operation.

KUNDAH POWER HOUSE - 1

WATER SOURCE - Avalanchi & Emerald Dam
LOCATION - Kundah bridge, The Nilgiris District. 32 KMS from Ooty and 90 KMS from Coimbatore
ELEVATION - 1,631.60 Metres (5353 Feet)
INSTALLED CAPACITY - 3 X 20 = 60 MW
No. OF UNITS - 3
DATE OF COMMISSIONING
UNIT-1 08-07-1960
UNIT-2 22-07-1960
UNIT-3 01-04-1964


KUNDAH POWER HOUSE - 2

WATER SOURCE - Kundah forebay dam, Tail race water of Power House-1 & It has a forebay capacity is 1000 Cusec.
LOCATION - Geddai, The Nilgiris District. 16 KMS from Kundah and 80 KMS From Coimbatore
ELEVATION - 876.60 Metres (2876 Feet)
INSTALLED CAPACITY - 5 X 35 = 175 MW
No. OF UNITS - 5
DATE OF COMMISSIONING
UNIT-1 30-10-1960
UNIT-2 10-01-1961
UNIT-3 02-05-1961
UNIT-4 16-06-1961
UNIT-5 23-02-1964


KUNDAH POWER HOUSE - 3

WATER SOURCE - Pegumbahallah Dam, Nirali Pallam and Kattery Weir & It has a forebay capacity is 1800 Cusec.
LOCATION - Pillur, The Coimbatore District. 40 KMS from Kundah and 80 KMS From Coimbatore
ELEVATION - 436 Metres (1429 Feet)
INSTALLED CAPACITY - 3X60 = 180 MW
No. OF UNITS - 3
DATE OF COMMISSIONING
UNIT-1 07-04-1965
UNIT-2 11-06-1965
UNIT-3 18-02-1978


KUNDAH POWER HOUSE - 4

WATER SOURCE - Pillur Dam ,Tail race water of Power House III & It has a forebay capacity is 6000 Cusec.
LOCATION - Parali, The Coimbatore District. 6 KMS from Parali
ELEVATION - 364 Metres (1193 Feet)
INSTALLED CAPACITY - 2X50 = 100 MW
No. OF UNITS - 2
DATE OF COMMISSIONING
UNIT-1 27-02-1966
UNIT-2 19-10-1978


KUNDAH POWER HOUSE - 5

WATER SOURCE - Western Catchment -1, Upper Bhavani Dam & It has a forebay capacity is 700 Cusec.
LOCATION - Avalanche, The Nilgiris District, 18 KMS from Kundah, 10 KMS from Emerald and 33 KMS from Ooty
ELEVATION - 1,989 Metres (6527 Feet)
INSTALLED CAPACITY - 2X20 = 40 MW
No. OF UNITS - 2
DATE OF COMMISSIONING
UNIT-1 30-10-1964
UNIT-2 06-12-1989

KUNDAH POWER HOUSE - 6

WATER SOURCE - Water from Western Catchment - 2 & 3 Dams, Porthimund Dam, Parsons Valley Dam & It has a Forebay Capacity is 683 Cusec.
LOCATION - Kattukuppam, The Nilgiris District
ELEVATION - 1,987 Metres (6519 Feet)
INSTALLED CAPACITY - 1X30 = 30 MW
No. OF UNITS - 1
DATE OF COMMISSIONING
UNIT-1 20-03-2000
Tail race waters fromthe Moyar power house are let out into the Moyar river.


Pykara-Moyar hydro-electric scheme

Pykara region has well protected Sholas, Toda settlements, undistributed grassy meadows and also a good wildlife habitat. Pykara is considered very sacred by the Todas, the tribal people in Nilgiris. River Pykara orginates from Mukurthi peak and drains from Pykara and Sigur, on the northern side of the Nilgiris form the River Moyar. Pykara and Sigur have got extremely steep slopes down which the river flows through a series of cascades. Mukurthi dam is in the upstream of river Pykara and larger Pykara dam immediately below and the waters from the dam are taken to Glenmorgan fore bay and diverted for power generation to Singara power house.

Glenmorgan, is ecologically rich forest spot with wonderful sholas and wildlife habitats. The Glenmorgan reservoir taps additional inflow into the fore bay. The tailrace waters from Singara power house are taken to Maravakandy dam through canals, and again taken to Moyar power house further down in the Moyar valley for power generation. Tail race waters from the Moyar power house are let out into the river Moyar.

PYKARA POWER HOUSE / SINGARA - 7

WATER SOURCE - Water from Mukuruthy Pykara, Sandynallah and Glenmorgon Dam & It has a forebay capacity is 351 Cusec.
LOCATION - The Nilgiris District, 75 KMS from Kundah, 40 KMS from Ooty, 30 KMS from Gudalur and 11 KMS from Moyar
ELEVATION - 1,036 Metres (3400 Feet)
INSTALLED CAPACITY - 59.2 MW (3X7 MW + 1X11MW + 2X13.6 MW)
No. OF UNITS - 7
DATE OF COMMISSIONING
UNIT-1 09-06-1933
UNIT-2 22-11-1932
UNIT-3 05-09-1932
UNIT-5 28-08-1939
UNIT-6 30-05-1954
UNIT-6 11-06-1954


PYKARA MICRO POWER HOUSE - 8

WATER SOURCE - Water from Pykara Dam and has Maximum Head of 113 Feet and Minimum Head of 25.23 Feet & It has a Dam Capacity is 300 Cusec.
LOCATION - The Nilgiris District, 55 KMS from Kundah, 20 KMS from Ooty, 36 KMS from Gudalur and 15 KMS from Glenmorgan
ELEVATION - 1,996 Metres (6550 Feet)
INSTALLED CAPACITY - 2 x 1 = 2 MW
No. OF UNITS - 2
DATE OF COMMISSIONING - 09-10-1989


MOYAR POWER HOUSE

WATER SOURCE - Water from Moyar forebay Dam, Maravakandy Dam, Pyakara power house tail race & It has a Dam Capacity is 446.25 Cusec.
LOCATION - The Nilgiris District, 80 KMS from Kundah, 48 KMS from Ooty, 36 KMS from Gudalur and 11 KMS from Singara
ELEVATION - 609 Metres (2000 Feet)
INSTALLED CAPACITY - 3x12 = 36 MW
No. OF UNITS - 3
DATE OF COMMISSIONING
UNIT-1 10-04-1952
UNIT-2 19-09-1952
UNIT-3 06-01-1953


MUKURTHY MICRO POWER HOUSE

WATER SOURCE - Water discharge from Mukurthy Dam & It has a Dam Capacity is 1.98 M.
LOCATION - The Nilgiris District, 32 KMS from Ooty
ELEVATION - 2,072 Metres (6800 Feet)
INSTALLED CAPACITY - 2x350 = 700 KW
No. OF UNITS - 2
DATE OF COMMISSIONING
UNIT-1 27-06-2001
UNIT-2 01-11-2003


MARAVAKANDY POWER HOUSE

WATER SOURCE - Water discharge from Pykara Power House & It has a Dam Capacity is 430 Cusec.
LOCATION - The Nilgiris District, 7 KMS from Moyar and 38 KMS from Ooty
ELEVATION - 884 Metres (2900 Feet)
INSTALLED CAPACITY - 0.75MW
No. OF UNITS - 1
DATE OF COMMISSIONING - 14-10-1992
The tailrace waters from Singara power house are diverted across Avarahalla stream through canals to Maravakandy dam. The Maravakandy dam in the 1930's led to an increase of population from about 400 people to 6000 and further to 18000 after PUSHEP.


Pykara Ultimate Stage Hydro Electric Project (PUSHEP)

WATER SOURCE - Water from Pykara & dam is not used for irrigation
LOCATION - The Nilgiris District, 40 KMS from Ooty and 30 KMS from Gudalur
ELEVATION - 2,073 Metres (6800 Feet)
INSTALLED CAPACITY - 2x50 = 150 MW
No. OF UNITS - 3
DATE OF COMMISSIONING - 06-09-2005


 